Basic Info.
Model NO.
DTM04-6P DTM06-6S
Compatible Equipment Make
Genie
Part Number
Dtm04-6p Dtm06-6s
Application1
Genie 5 Control Box Coil Connector
Quality Level
High Performance
Stock
Enough
Weight
0.1kg
Transport Package
Standard Export Packing
Specification
5X4X1 cm
Trademark
HNARL
Origin
China
Production Capacity
500pieces/Week
Product Description
HNARL High Quality 6 pin Connector DTM04-6P DTM06-6S
Deutsch 6 pin Connector | |
Parts No: | DTM04-6P,DTM06-6S |
Used for | Genie 5 control box,Coil connector. Deutsch 6-Pin Connector Kit with Housing, Pins & Seals Crimp Style Terminals 14-16 Gauge, Recommended Insulation O.D. Range: 2.41- 3.81 (mm) |
What's is included:
1x (6 pin) Deutsch Male Connector
1x (6 pin) Dectsch Female Connector
1x Wedge for Lock Female
1x Wedge for Lock Male
6x Male Crimp Type Terminals
6x Female Crimp Type Terminals
Overview
Deutsch DT Series of environmentally-sealed, connectors are designed speci cally for cable to cable applications on the engine or transmission, under the hood, on the chassis or in the cab. Where signal level circuits in harsh environmental conditions, where even a small degradation in connection may be critical, the Deutsch DT Series general purpose connectors will provide the reliability and performance at the lowest cost.
Key & Feature: | Item Specification: - Housing Made out of Polyamide (PA) - Accepts contact size 16 (13 amps) - 6 Pins arrangements, Inline mounting. - Contact Material Copper Alloy -Wire Insulation O.D Range: .095 - .150 (2.41 - 3.81) - Air Size 14-18 AWG (2.0 - .75) - RECOMMENDED STRIP LENGTH INCHES (mm) .150 - .200 (3.81 - 5.08) | |
Item. | Deutsch 6-Pin (14-16 Gauge) ( 1 Set ) | |
Temperature: | Operating at temperatures -55°C to +125°C | |
Durability: | No electrical or mechanical defects after 100 cycles of engagement and disengagement. | |
Insulation Resistance: | 1000 megohms minimum at 25°C. | |
Immersion: | IP68 rating | |
Vibration: | No unlocking or unmating and exhibits no mechanical or physical damage after sinusoidal vibration levels of 20 G's at 10 to 2000 Hz in each of the three mutually perpendicular planes. No electrical discontinuities longer than 1 microsecond. | |
Moisture Resistance: | No cracking, chipping or leaking after 20 test cycles . Dielectric Withstanding Voltage: Current leakage less than 2 milliamps at 1500 volts AC | |
Thermal Cycle: | No cracking. | |
Grommet: | Silicone rubber | |
Insert Retainer: | Thermoplastic | |
Receptacle Interfacial Seal: | Silicone rubber | |
Shell: | Thermoplastic | |
Wedgelocks: | Thermoplastic |
Product Delivery | Shipping Time | Start & End | Descriptions |
By Express. DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect | 3-8 working days | Door to Door | For Small order, Sample order, Trial order Fast & Convenient |
Air Transportation By Plane | 5-10 working days | Door to Airport | For Medium order Fast & Cheaper than express The consignee needs to take delivery at the airport |
Sea Transportation By Vessel | 20-45 days | Door to Seaport | For Mass order Cheap but take time The consignee needs to take delivery at the seaport |
FAQ
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.